Building · Residential Alteration
BLD-2026-003613 — S12 live verification lanai
CancelledInspections
| Type | Scheduled | Contact | Status |
|---|---|---|---|
| Electrical rough-in | 2026-11-05 08:00 | Smoke Test 7275550100 |
Scheduled |
| Electrical rough-in | 2026-11-04 09:00 | Smoke Test 7275550100 |
Scheduled |
| Electrical rough-in | 2026-11-04 09:00 | Smoke Test 7275550100 |
Scheduled |
| Electrical rough-in | 2026-11-04 08:30 | Smoke Test 7275550100 |
Scheduled |
Dispatch history
- scheduled · Electrical rough-in · 2026-11-03 05:17 — Requested for Smoke Test via the portal by Dana Alvarez
- scheduled · Electrical rough-in · 2026-11-03 05:17 — Requested for Smoke Test via the portal by Dana Alvarez
- scheduled · Electrical rough-in · 2026-11-03 05:17 — Requested for Smoke Test via the portal by Dana Alvarez
- scheduled · Electrical rough-in · 2026-11-03 05:16 — Requested for Smoke Test via the portal by Dana Alvarez
Schedule an inspection
Three steps: pick an available date and time window, verify the site location and contact, then confirm the policy and notes. Reschedule or cancel before 3:00 PM on the business day before the appointment. New appointments must be booked at least 1 day ahead. Cancelling releases the time window for other requests.
Sign in to schedule